Get a quote
EN ⌄
English简体中文Русский

How to Choose a Reliable Portable Power Station Supplier in China

For importers, wholesalers, distributors and private-label buyers.

A reliable portable power station supplier should be able to connect the product you order with a clear manufacturing responsibility, a version-controlled specification, relevant supporting documents and an achievable after-sales arrangement. A low unit price or a page of certification logos cannot establish those connections. Start with the market and customer you serve, then evaluate the supplier against the exact product configuration you intend to purchase.

1. Define the product your channel can actually sell and support

Write a short buying brief before requesting quotations. Include the destination country, customer type, expected order quantity, intended equipment, output voltage and frequency, plug requirements, charging options and preferred carrying format. Separate essential requirements from optional features.

For a distributor, weight, packaging dimensions and repair arrangements can matter as much as nominal energy capacity. A wheeled unit may suit customers who move equipment on level surfaces; a handle alone does not establish that a product is convenient to carry upstairs. Check the actual dimensions, weight, handles and wheels using the proposed sample.

Also distinguish an integrated portable power station from a mobile home-storage battery. A battery enclosure with wheels does not necessarily contain an AC inverter or provide socket outputs. Confirm what is inside the quoted unit and what additional equipment is required.

2. Verify who sells, manufactures and supports the product

Ask for the legal contracting entity, the manufacturing arrangement for the selected model and the party responsible for quality and warranty decisions. A supplier may manufacture some products and source others through cooperating factories. That arrangement needs to be explained clearly rather than hidden behind a general factory claim.

Check whether the company names on the quotation, product documentation and proposed contract are consistent, or whether a documented relationship explains the differences. Request model-specific evidence of the relevant production and inspection process. A photograph of a production line is useful only when its location, ownership and relationship to your order are established.

HSY supplies portable power stations and home energy storage products using a combination of in-house production and cooperating factories. The production arrangement, available documents and responsibilities must be confirmed for the selected model; this is not a claim that every HSY-listed product is made at one owned facility.

3. Compare specifications on the same basis

Use one comparison sheet across shortlisted suppliers. For each offered version, record:

  • Rated AC output and any short-duration surge rating, including its duration and conditions.
  • Nominal battery energy, usable output information and the conditions behind any runtime statement.
  • Supported input sources, charging limits and any restrictions on simultaneous charging and discharge.
  • Output voltage, frequency, sockets, USB outputs and supplied charging accessories.
  • Charging, discharging and storage temperature limits, plus any power reduction at temperature extremes.
  • Weight, dimensions, packaging, operating instructions and the exact model or revision identifier.

Power and energy answer different questions: watts help determine which loads can run, while watt-hours help estimate duration. A preliminary runtime estimate is usable output energy divided by average load power. If only nominal battery energy is known, additional assumptions about usable capacity and conversion losses are necessary. Treat that estimate as a screening tool, then test the actual load; do not label a calculation as measured runtime.

4. Check documents against the exact model and intended use

Build a document list with the importer and, where appropriate, a qualified compliance adviser. Record each document's issuer, applicant, manufacturer, covered model, product version and scope. Verify references through the issuer or an official database where available. A report for a cell, charger or unrelated controller does not establish conformity of the complete power station.

UL distinguishes portable power packs from stationary energy storage in its discussion of UL 2743 and UL 9540. These are not interchangeable product categories, and mentioning a standard does not mean a particular product is certified. Use the UL portable power pack explanation to frame questions for the relevant market and application.

Transport evidence is another separate check. Request the applicable lithium battery test summary and have the shipping arrangement reviewed for the actual product and route. PHMSA's test-summary guidance explains that requirement; it does not establish approval for every use of the finished power station. This guide does not assert certification of any HSY model.

5. Turn the sample into a purchasing decision

Agree on an acceptance plan before ordering a sample. Specify the sample version, accessories, output configuration, inspection items and evidence you expect to receive. Test normal operation with representative loads and confirm charging behavior, controls, instructions and packaging. Arrange electrical safety assessment with appropriately qualified personnel; a buyer's functional check is not a substitute for that assessment.

Record results and exceptions. Keep an approved reference sample or an agreed reference record, and define how bulk production will be compared with it. Ask how component or firmware substitutions will be proposed, approved and recorded. A successful sample does not automatically approve an undocumented later version.

6. Compare the complete commercial arrangement

Request a written quotation that identifies the model, supplied items, packaging, quantity, shipping basis and exclusions. Confirm the minimum order quantity and delivery schedule for that configuration rather than applying a website headline to every order.

Discuss warranty eligibility, fault diagnosis, spare parts, labor, return transport and replacement responsibilities. Establish who supports the end customer locally. If a distributor cannot perform repairs, agree on an alternative before offering service commitments to its own customers. Ask what records are needed for a claim and who makes the decision.

7. Shortlist products and send a useful inquiry

Start with the HSY portable power station range. Existing product pages include SL-69, MC06 and WT16. Use them to identify a candidate, then request the current configuration and supporting documents. These links are starting points, not a claim that every version meets your market's requirements.

Copy this brief into the existing Request a Quote form:

We are a [business type] serving [country/market]. We are interested in [model or application] for [customer use]. Our expected sample/batch quantity is [quantity]. Required output and plugs: [details]. Main loads and required operating time: [details]. Branding or packaging requests: [details]. Please confirm the proposed configuration, production responsibility, available model-specific documents, sample terms and after-sales scope.

For branded orders, continue with the OEM/ODM procurement guide. If you are sourcing a battery for an installed residential system, use the home energy storage sourcing guide.

Questions buyers often need to settle

Is the lowest quotation necessarily the best starting point?

Compare quotations only after aligning the configuration, supplied accessories, documents and support responsibilities. A lower price for a different scope is not a like-for-like saving.

Can one certificate cover every model in a catalogue?

Only the documented scope can answer that question. Check the listed models and versions; do not infer coverage from a logo or similar appearance.

What should a first inquiry achieve?

It should establish a suitable candidate and reveal missing information. A confirmed configuration, sample plan and responsibility list are more useful than an unsupported promise of the fastest shipment.

For detailed load and runtime calculations, read the power and capacity buying guide.

Request a Quote ↗

How to Source Home Energy Storage Systems from China

For importers, home-storage distributors, installers and brand buyers.

Successful home energy storage procurement starts with a defined system, not just a battery capacity. Establish what the supplier will provide, which inverter and controls it must work with, who will install it and what evidence is required in the destination market. A battery that looks suitable in a catalogue may still be unsuitable for the intended installation or service arrangement.

1. Define the use case and the supply boundary

Identify whether customers need backup for selected circuits, solar self-consumption, an off-grid installation or another documented purpose. Record the expected loads, required operating time, existing solar equipment and whether the installation will connect to a public electricity network. These inputs affect system design and cannot be replaced by a headline capacity figure.

Ask whether the quotation covers a DC battery, a battery with an inverter, or a more complete package. List the included controls, cables, communication accessories, protection equipment and installation documentation. Establish who supplies any missing items and who accepts responsibility for the assembled system.

For a distributor, this boundary also defines the support business. Selling a battery to a trained installer is different from supplying a complete solution to an end user. Confirm the intended sales channel before agreeing on training, commissioning and warranty responsibilities.

2. Select the format after checking the installation

Wall-mounted and floor-standing or mobile units solve different space and handling problems. Check floor or wall suitability, equipment weight, service access, ventilation and the manufacturer's permitted installation environment. Do not select an enclosure solely from a photograph.

A wheeled battery is still subject to its installation and connection requirements. Wheels do not make a permanently connected system a portable AC appliance. Likewise, an indoor location does not remove the need to assess temperature, moisture and clearance requirements. Obtain the model's installation manual and have the proposed arrangement checked by the responsible qualified installer.

For the first order, favor a configuration that your local team can explain, install and maintain. A wider catalogue is useful only when the associated documentation and support remain manageable.

3. Verify electrical and communication compatibility

Request the exact battery voltage range, charge and discharge current limits, protection arrangements and allowed expansion configuration. Then compare these with the exact inverter model and its requirements. A shared nominal voltage does not establish full compatibility.

For systems using communication between the battery management system and inverter, record the protocol, cable arrangement, hardware revision and firmware versions. Ask for evidence of the proposed combination, including normal operation and relevant fault or limit behavior. Agree who resolves a compatibility issue if two manufacturers are involved.

Victron's battery compatibility documentation illustrates the importance of named battery arrangements and supporting information. It is a useful example of the verification process, not evidence that HSY is listed or approved by Victron. Do not convert a general claim such as “supports CAN communication” into “compatible with all inverters.”

4. Compare usable performance rather than isolated numbers

Separate energy capacity, output power and operating duration. Battery energy alone does not determine the AC load that an installed system can support; the battery, inverter and other system limits all matter. Request the usable-energy basis, operating limits and conditions behind performance claims.

When reviewing cycle-life information, ask for the test temperature, charge and discharge rate, depth of discharge and remaining-capacity threshold. Distinguish test results, design targets and warranty obligations. A cycle-life figure is not automatically a promise of a particular number of years in every household.

Discuss the actual climate. Charging and discharging temperature ranges can differ. Ask about any required heating, cooling or power reduction, and confirm which features are included in the offered configuration. Avoid assuming weather resistance, outdoor suitability or low-temperature charging capability without model-specific evidence.

5. Map the market requirements to the proposed system

Prepare a document matrix for the destination and intended installation with the importer, installer and appropriate local advisers. Include the finished product or system requirements, battery documentation, transport records and any applicable grid-connection or installation approvals. Assign an owner to each outstanding check.

The distinction between portable products and stationary storage matters. UL's explanation of portable power packs shows why a portable-product reference should not be treated as approval for a stationary system. The relevant requirements depend on the product and application; this guide does not determine legal market access or certify an HSY configuration.

Request documents that identify the actual manufacturer, covered model and relevant version. Where a report concerns a component, record that limited scope. Keep “available,” “requested” and “not verified” as separate statuses instead of describing an incomplete document set as fully approved.

6. Use a controlled pilot before extending the product range

Agree on a pilot configuration and acceptance checklist. Confirm the supplied equipment, serial or version records, installation instructions and responsibilities. The installer should document commissioning and test the agreed operating modes with appropriate equipment and procedures.

Review practical service issues as well as normal operation: access to settings, interpretation of alarms, availability of manuals, replacement compatibility and the information needed for remote diagnosis. Record unresolved items before expanding the order. Do not assume that a pilot in one market or with one inverter validates every later configuration.

Define how hardware and firmware changes will be communicated. When expanding an installed battery system, follow the manufacturer's supported arrangement rather than assuming that any later unit can be added to an earlier installation.

7. Agree on the commercial and support responsibilities

Ask for a quotation with a clear bill of supplied items and exclusions. Confirm sample and order quantities, packaging, delivery terms and the conditions affecting the proposed schedule. Do not promise a local customer an installation date before the equipment and project responsibilities are agreed.

Set out warranty eligibility, documentation required for a claim, diagnostic responsibility, spare parts, labor and transport costs. Define who supports the end user and who can authorize replacement or repair. A distributor should understand those boundaries before printing its own warranty statement or training its sales team.

8. Begin with an identifiable HSY product and a complete brief

HSY's initial B2B focus includes portable power stations and home energy storage, with both in-house and cooperating-factory production arrangements across its product lines. Confirm the arrangement and available evidence for each selected model.

Explore the home energy storage range, HSY-D16KWH-P04, HSY-D20KWH and the wall-mounted HW-B01. These are DC battery products; the inverter and solar panels are separate from the battery supply. Request the current specification, exact supplied items and evidence for the intended inverter combination. A battery page or model name does not establish approval of a complete AC system.

Use the existing Request a Quote form with this brief:

We supply/install home energy storage in [country]. Our customer use case is [backup/solar self-consumption/other]. Proposed battery format and capacity requirement: [details]. Existing or proposed inverter, model and firmware if known: [details]. Required loads and operating time: [details]. Installation conditions: [details]. Expected quantity and local service arrangement: [details]. Please confirm the supply boundary, compatibility evidence, available model documents and sample or pilot requirements.

If the inverter or load details are not yet known, say so. The first useful response is a list of the missing inputs and a candidate configuration, rather than an unsupported assurance of compatibility. For branding and development requirements, continue with the OEM/ODM procurement guide.

Questions buyers often need to settle

Does a home battery include an inverter?

Confirm the quotation. The linked HSY battery products are DC batteries, with the inverter and solar panels separate. Ask for a complete equipment list before comparing system prices.

Does CAN communication prove inverter compatibility?

No. Verify the named battery and inverter combination, protocol, cable arrangement and firmware. Request evidence for that configuration.

For detailed load and runtime calculations, read the power and capacity buying guide. For a fill-in project brief, use the home storage quote checklist.

Request a Quote ↗

OEM/ODM Energy Storage Procurement Guide for Importers and Distributors

For private-label brands, importers, wholesalers and distributors sourcing portable power stations or home energy storage.

An OEM/ODM order needs a shared definition of the work. A logo on an existing product, a different enclosure and a new battery-management design are different projects with different evidence, costs and responsibilities. Before asking for a price, identify the product platform, target market and exact changes required. Then use documented approval steps from feasibility review through sample acceptance and production release.

1. Replace the label “customized” with a scope list

Suppliers and buyers may use OEM and ODM differently. Put the requested deliverables in writing instead of relying on the label alone. Divide the request into three practical groups:

  • Brand presentation: logo, labels, packaging artwork, language versions and manuals.
  • Product configuration: supported output versions, sockets, accessories, enclosure options or other changes within an established platform.
  • Engineering development: changes to electronics, battery management, firmware, mechanical design or system integration that require separate technical assessment.

These groups are a procurement framework, not a statement that every option is available from HSY. Each request needs confirmation for the proposed model. An example of packaging customization does not prove the ability to redesign an inverter or develop a new control system.

2. Choose a platform before commissioning changes

Start from a product that fits the customer's use case and the destination market. Record its model, current configuration and supplied accessories. Identify which characteristics must stay unchanged and which the buyer wants to modify.

For portable products, clarify output, charging, load requirements and carrying format. For home storage, define the battery and inverter boundary, installation conditions and required compatibility. A similar enclosure or capacity does not mean that the internal platform or compliance scope is the same.

Existing starting points include the HSY portable power station range, MC06, WT16 and HSY-D16 home-storage battery. Treat these as candidates for discussion. Their availability for a specific customization or market must be confirmed.

3. Confirm the responsible companies and decision makers

Identify the contracting supplier, manufacturer for the selected model, design responsibility and party approving production changes. Where a cooperating factory or another engineering provider is involved, establish how requirements, inspections and corrective actions will be managed.

HSY uses both in-house and cooperating-factory production arrangements across its product lines. The arrangement for a particular product and the ability to perform a particular customization require model-level confirmation. This guide makes no claim about the number of factories, production capacity or ownership of a specific design.

Ask who can approve artwork, technical specifications, software revisions, inspection outcomes and warranty decisions. An order is easier to control when those decisions have named owners and written records.

4. Prepare a feasibility brief that supports a real quotation

Provide the destination, sales channel, intended application, expected initial quantity and realistic repeat-order assumptions. Identify required languages, branding files, packaging, accessories and documentation. Separate a target specification from an existing verified feature.

For each change, ask the supplier to state whether it is supported as offered, requires engineering assessment or is outside the proposed scope. Record unresolved technical questions. Do not treat silence in a quotation as acceptance of a requirement.

Request separate treatment of product price, samples, development work, tooling, testing and packaging where those items apply. Confirm minimum quantities and schedules for the specific configuration. This guide does not state a universal HSY minimum order, development fee or delivery time.

5. Review documents and branding obligations before approval

Identify which product evidence is available for the original platform and what review is needed after the requested changes. A different brand name, applicant, component or configuration can create documentation questions; ask the relevant issuer or qualified adviser about the actual change rather than assuming automatic coverage.

Maintain a list of the proposed market requirements, existing files, covered models, document owners and missing items. Product marking, importer information, language and instructions should be checked for the intended market. A certification logo on an artwork file is not permission to use it.

For lithium battery transport, request the applicable test-summary information and confirm the shipping arrangement for the final configuration. PHMSA's official guidance provides background on test summaries. Transport documentation does not settle all requirements for selling or installing the finished product.

6. Approve a sample and a controlled reference package

Agree what the sample must demonstrate before it is produced. A branding sample can confirm artwork and appearance; an engineering sample may need a wider test and review plan. Identify any features that remain provisional.

The approved reference package should include the model and revision, agreed specification, artwork, packaging, accessories, relevant manuals and acceptance criteria. Keep sample results and exceptions with that record. If a required item fails, resolve it or explicitly revise the agreed requirement before authorizing production.

For home storage, include the intended inverter combination and supply boundary where relevant. For portable products, include the offered output version and representative load checks. Use appropriately qualified personnel for safety-related assessment. Do not confuse routine functional inspection with independent certification.

7. Control changes and responsibilities through production

Agree on how substitutions and design changes will be proposed and approved. The supplier should identify changes that could affect performance, documentation, compatibility or service. Decide which changes need a new sample, updated records or further assessment.

Define production inspection, traceability and the evidence expected before shipment. If third-party inspection is required, agree its scope, timing, acceptance criteria and costs. Inspection should refer to the approved specification rather than a generic checklist detached from the order.

For development projects, settle ownership or permitted use of tooling, drawings, firmware and brand assets in the contract. Clarify access, maintenance and any restrictions on future use. Do not assume that paying a tooling charge automatically transfers every intellectual-property right.

8. Plan the after-sales process before launching the brand

Decide who responds to customers, performs diagnosis, supplies parts and approves claims. Identify what serial, version and operating information must accompany a service request. Agree on repair, replacement, labor and shipping responsibilities and any relevant exclusions.

The brand's public warranty should match the obligations it can actually deliver. A supplier's support arrangement may not cover every local retail obligation or every expense. Confirm those gaps before printing packaging or promising service terms to distributors.

9. Send a scoped request for quotation

Use the existing HSY Request a Quote form. This copyable brief helps separate a standard-product inquiry from a development project:

We are a [brand/importer/distributor] serving [market]. Proposed product or application: [details]. Initial quantity and repeat-order assumptions: [details]. Requested changes: [logo/packaging/language/configuration/engineering details]. Required output or inverter combination: [details]. Documents required by our market or customer: [details]. Local after-sales arrangement: [details]. Please confirm feasibility, available supporting evidence, sample approval steps and a quotation identifying inclusions and exclusions.

Use placeholders only for information still unknown; do not invent quantities to obtain a quotation. A useful next step is a confirmed scope and a list of open decisions. For earlier product screening, read the portable supplier guide or home storage sourcing guide.

Questions buyers often need to settle

Does a logo change establish full ODM capability?

No. Branding, configuration changes and engineering development need different evidence and approval steps. Confirm the supported scope for the selected model.

Is there one minimum order quantity for every customized product?

This guide states no universal minimum. Request terms for the product, customization scope and quantity in your brief.

For detailed load and runtime calculations, read the power and capacity buying guide.

Request a Quote ↗

What Information Do You Need for a Home Energy Storage Quote?

Describe the energy problem first, then share the loads, operating time and equipment already on site. You can start a discussion without choosing a battery capacity: provide what you know and identify what is unknown instead of guessing a specification.

1. Define the purpose and backup scope

Do you need essential loads during outages, greater solar self-consumption, or power for an off-grid application? List essential and non-essential loads and indicate which run together. Whole-home backup and essential-load backup have different requirements; a monthly electricity bill alone does not describe the loads.

2. Separate load power from operating time and energy

For each appliance, list quantity, operating power, daily hours, simultaneous operation and available startup data. Prefer nameplate or manual information. Do not apply one startup multiplier to every motor or air conditioner. If available, provide daily or interval energy readings with dates and operating conditions.

State whether you want a particular number of backup hours or part of a day's energy use. Continuous power informs inverter selection; energy demand informs battery sizing. Permitted discharge range, conversion losses, system consumption and operating conditions affect the result. See our power and capacity buying guide. These are buyer requirements, not a runtime or compatibility guarantee for any product.

3. Describe existing solar, inverter and grid equipment

Say whether equipment is installed, planned or not yet selected. For an existing inverter, share the brand, full model, hardware or firmware version if known, battery voltage range and communication documentation. For solar, provide installed power and the current connection arrangement. Where DC matching is needed, qualified personnel should check string voltage, current and equipment input limits.

Include local voltage, frequency, single- or three-phase supply, grid availability and any connection or export restrictions. A matching brand or connector shape does not prove compatibility. Do not dismantle equipment or take live measurements just to collect enquiry information.

4. Explain installation conditions and target capacity

Describe indoor or outdoor location, available dimensions, access for handling, intended position, ambient temperature conditions and who will install the equipment. A wall-mounted format requires the installer to assess the wall and fixings. Other formats also require checks of space, load-bearing capacity and suitable environment.

If you already have a capacity target, specify whether it means nominal battery energy, desired usable energy or energy required at the loads, in kWh. Record power separately in kW. If unsure, request sizing support. Explore home energy storage formats or the wall-mounted home storage option; choosing a format does not confirm the configuration.

5. Specify purchasing scope, destination and quantity

List separately the battery, inverter, solar modules, mounting hardware, cables, protection and communication components, shipping and installation services you want quoted. Requested items are not a commitment that HSY supplies them all, and are not automatically included with a product. Explain whether this is battery replacement, expansion or a discussion of a complete proposal.

Provide destination country and city, estimated quantity, sample or volume requirement, target use date and import, local certification or project-document requirements. A target date is not a supplier lead-time commitment; a requested quantity is not an MOQ statement. HSY supports OEM/ODM discussions for home storage. Submit branding, appearance and other specific requests separately; applicability and terms depend on the written proposal agreed for the project.

6. Compare the scope of each quotation

Check model and version, quantity, definitions of nominal and usable energy, whether an inverter is included and its model, connection and protection components, required documents, shipping and installation responsibilities. Separate options, exclusions and buyer-supplied items. Review applicable certification documents, warranty terms, lead time, payment and trade terms rather than applying conditions from another model or previous order.

7. A checklist you can complete and copy

Edit this checklist in your browser. Copying it does not submit an enquiry. Write “unknown” where needed and avoid unrelated personal information. You can also open the enquiry form directly without completing the checklist.

Frequently asked questions

Can I enquire before I know the required kWh?

Yes. Share essential loads, operating hours, existing equipment and project location, and request sizing support. An initial discussion is separate from the final configuration and quotation.

Is the inverter brand alone enough?

No. Provide the full model and available electrical, communication and version information. Compatibility must be checked for the proposed configuration; this guide does not establish an approved-brand list.

Does a home storage quotation automatically include solar and installation?

No. Only equipment and services explicitly listed in the written quotation belong to that quoted scope. Ask separately about other items and responsibilities.

Must I finish the checklist before contacting HSY?

No. Send the information already available and distinguish estimates from measured values. Appropriately qualified personnel should confirm wiring, grid connection and installation matters.

Discuss a home storage proposal

How to Choose Power and Capacity for Energy Storage

Choose output power to match the equipment you need to run, then estimate energy capacity for the required operating time. A useful purchasing brief covers continuous load, startup demand, runtime and the actual electrical configuration—not just the largest number on a specification sheet.

1. What do W, kW, Wh and kWh mean?

W and kW describe power at a particular moment; 1 kW equals 1,000 W. Wh and kWh describe energy; 1 kWh equals 1,000 Wh. For a constant load, energy use is power multiplied by operating time. See the EIA explanation of electricity measurement.

A hypothetical 100 W load running for three hours needs 300 Wh at the load. The battery may need to store more because the usable energy window, conversion losses and system consumption affect how much energy reaches the equipment.

Do not compare Ah alone across different voltages. At the nominal voltage of the same battery pack, Wh is approximately V × Ah. Do not mix cell voltage, assembled-pack capacity and AC output voltage.

2. Rated output versus peak output

Rated output describes continuous load capability under the specified conditions. Peak or surge output applies only for a limited duration and under defined conditions. It is not a substitute for the continuous rating. Motors and compressors can have startup requirements different from their running demand; obtain the equipment’s startup data and compare it with the inverter’s overload-duration curve rather than applying one universal multiplier.

Add the continuous power of equipment that can run together, then check the worst relevant startup combination. Also check voltage, frequency, phase arrangement, port or per-phase limits and current limits. Where equipment is rated in VA, distinguish apparent power from real power in W; the figures are not automatically interchangeable.

Allow for planned additions, temperature-related derating and variable loads as appropriate. There is no single margin that guarantees compatibility for every application. Meeting a power figure is only one part of the equipment check.

3. Estimate runtime with explicit assumptions

For an initial constant-AC-load estimate:

Runtime (hours) ≈ nominal energy (Wh) × usable fraction ÷ [load power (W) ÷ inverter efficiency + battery-side system consumption (W)].

The usable fraction represents the energy window between the starting charge and the retained reserve. System consumption is measured on the battery side in this model. If the supplier already provides measured usable energy at the load under specified conditions, divide that value by the corresponding load power instead of applying the same losses twice.

Example A: a hypothetical portable-power requirement

Assume 1,000 Wh nominal energy, a 90% usable fraction, 90% inverter efficiency, 10 W battery-side system consumption and a constant 200 W load, with no charging during operation. Estimated runtime is 1,000 × 0.90 ÷ (200 ÷ 0.90 + 10) = 3.88 hours.

For four hours under those assumptions, the nominal energy requirement is approximately (200 ÷ 0.90 + 10) × 4 ÷ 0.90 = 1,032 Wh. This is an energy calculation, not a complete product selection. Continuous output and startup capability must also be sufficient, with provision for the actual environment and intended reserve.

All equipment and efficiency figures in this example are assumptions, not HSY product specifications or measured runtime results. Changing the usable fraction to 80% and efficiency to 85%, with the other assumptions unchanged, reduces the 1,000 Wh estimate to about 3.26 hours. Temperature, battery ageing, varying loads, low-load shutdown and protection settings can change the result.

Example B: an energy budget for essential household loads

Assume selected essential loads average 0.5 kW for six hours. They require 3 kWh at the load. With an assumed 90% usable fraction and 90% one-way conversion efficiency, and temporarily excluding system consumption, nominal storage would be approximately 3 ÷ (0.9 × 0.9) = 3.70 kWh. Excluding system consumption makes this estimate optimistic; add the actual system demand and an appropriate planning allowance.

The 0.5 kW average does not determine inverter size. Simultaneous demand or startup demand may be much higher. This is not a whole-home backup design or confirmation that a product can connect directly to household wiring. Home battery sizing also depends on individual needs and installation conditions, as discussed in the Energy Saving Trust battery storage guide.

4. Read a real product specification: CYS01

The CYS01 product page lists 300 W rated output, 296 Wh stored energy and 450 W peak output. The 300 W figure addresses continuous output capability; 296 Wh describes stored energy. The 450 W peak figure is not a continuous operating rating.

Dividing 296 Wh by an appliance’s wattage does not establish verified runtime. Confirm the peak duration, relevant output-port ratings and electrical version for the proposed order. This guide does not assign assumed efficiency to CYS01 or guarantee compatibility with a particular appliance.

5. Match the buying brief to the application

If charging while supplying loads is important, confirm that the specific product supports this mode and check its input/output limits. Solar-panel nameplate power is not constant available charging power throughout the day. Without a defined charging profile, start with a no-charging runtime estimate.

6. What to include in a quotation enquiry

If you have not selected a model, use the existing enquiry form’s “Help me select” option and share the equipment information available. Discuss selection and request a quotation from HSY.

Frequently asked questions

Does more capacity mean more output power?

Not necessarily. Energy capacity and continuous output are separate specifications. More kWh does not automatically increase the inverter or port kW limit.

Is a sufficient peak wattage enough to guarantee startup?

No. Duration, starting current, load behaviour and protection settings also matter. Check the specific equipment and, where needed, verify operation under agreed conditions.

Can I use the maximum wattage on an adapter to calculate runtime?

It can provide an initial upper-power reference, but it may not represent average consumption. Charging stage, operating mode and duty cycle affect demand. Where practical, obtain actual power and energy measurements using an appropriate method.

Does this guide replace final product selection?

No. It helps structure requirements and compare specifications. Confirm the model, electrical configuration, scope of supply and performance-verification conditions in writing before purchase.

IP Geolocation by DB-IP